- District Heating Facilities
- Building Central Heating
- Steam Plants
- Process Industry Applications
- Efficiency Upgrades
Efficiency Upgrades - EU-1
Location: St. Catharines, Ontario, Canada
Date Commissioned: November 2006
Project Description: Energy efficiency improvements to existing Crone / Zantingh greenhouse heating boilers.
Scope of Supply: Engineer, new equipment supply, install and commission including,
- Retrofit linkageless combustion and burner management control systems.
- Variable speed drive and control on combustion air fans.
- Upgrade main and pilot gas trains for local gas code compliance.
- Secondary oil fuel system modifications and upgrades.
Special Features:
- Improvement of burner performance for low excess air and increased turndown.
- Accurate response to load changes using PID and linkageless combustion control.
- Linkageless controls with integrated burner management and flame safeguard.
- Remote control and boiler sequencing interface to greenhouse central control system.
- Interface and control features for flue gas condensers and CO2 dosing systems.