- District Heating Facilities
- Building Central Heating
- Steam Plants
- Process Industry Applications
- Efficiency Upgrades
Building Central Heating - BCH-1
Date Commissioned: November 1999
Project Description: Expansion of building heating system and existing boiler replacement
Scope of Supply: Engineer, package, transport to site, verify correct installation and commission, including:
- 2 packaged watertube design hot water boilers, ASME section 4
- Capacity of 1100 BHP (37,950 MBH) each
- Fueled by natural gas / #2 oil
Special Features:
- High turndown, low excess air burners
- Low NOX emission control using induced flue gas recirculation
- Linkageless combustion control
- Variable speed drive and control of combustion air fan
- Continuous flue gas emissions monitoring with automatic O2, CO2, CO trim
- Integrated burner management and flame safeguard
- Remote surveillance via communication gateway