Building Central Heating - BCH-1

Location: Edmonton, Alberta, Canada

Date Commissioned: November 1999

Project Description: Expansion of building heating system and existing boiler replacement

Scope of Supply: Engineer, package, transport to site, verify correct installation and commission, including:

  • 2 packaged watertube design hot water boilers, ASME section 4
  • Capacity of 1100 BHP (37,950 MBH) each
  • Fueled by natural gas / #2 oil

Special Features:

  • High turndown, low excess air burners
  • Low NOX emission control using induced flue gas recirculation
  • Linkageless combustion control
  • Variable speed drive and control of combustion air fan
  • Continuous flue gas emissions monitoring with automatic O2, CO2, CO trim
  • Integrated burner management and flame safeguard
  • Remote surveillance via communication gateway